Update:

January 18, 2002
(Click here to see previous updates)

This update shows continued progress on several aspects of ELYSIUM. All of the hull framing is complete; engines, transmissions, fuel tanks, and hydraulic steering components are installed. Plywood decks have been laid. A few planks, including both garboards, have been replaced, all the new fastenings plugged, and the hull has been sanded fair. We've begun installing potable water and sanitation tanks and plumbing. We've laid out the coaming/cabin sides and have scarfed 2 mahogany planks together to make a single piece 32 feet long. The original trunk-house top has been temporarily positioned in order to fit the sides.

(Click on images to enlarge them, then return with your back button)

                                     
Above: (l-r) Setting the cabin top in place; using the router and a special jug to cut the scarf; the new cabin side.

               
Galley construction; engines in place, checking the blueprints.


(Click here to see previous updates)


Growler Restoration | Dark Harbor 20 Restorations | Truant Project | Bunker & Ellis Restorations




About PYY | What's New | Restorations | Boats for Sale | Charters | Pendleton 43 | Services | Links | Contact Us | Home

All material copyright 2001 Pendleton Yacht Yard, Inc